checklist:shapeokoinitnotes
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| checklist:shapeokoinitnotes [2025/09/14 22:42] – lots o stuff 8c244b37-0747-c193-0a4e-0967254778dd | checklist:shapeokoinitnotes [2025/11/13 18:32] (current) – 8c244b37-0747-c193-0a4e-0967254778dd | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| Notes for Initializing the Shapeoko when first starting for the day | Notes for Initializing the Shapeoko when first starting for the day | ||
| - | ====== **VERY MUCH A WORK IN PROGRESS USE FOR REFERENCE ONLY** ====== | ||
| + | **This detailed guide is subject to change so, for personal and machine safety, please ask an experienced lab member to assist in helping you through your first couple of uses.** | ||
| + | |||
| + | ## Initializing The Shapeoko Within Carbide Motion ## | ||
| - 1. start Carbine Motion | - 1. start Carbine Motion | ||
| - 2. turn on Shapeoko | - 2. turn on Shapeoko | ||
| Line 43: | Line 45: | ||
| - 10. When prompted remove the BitZero magnetic ground clip | - 10. When prompted remove the BitZero magnetic ground clip | ||
| - 11. When you click continue the machine should automatically measure the bit. | - 11. When you click continue the machine should automatically measure the bit. | ||
| - | - 12. If you are not cutting all the way though your project board, rather are just cutting profiles or pockets | + | - 12. If you are not cutting all the way though your project board, rather are just cutting profiles or pockets |
| ### Option - B Set X/Y separate from Z### | ### Option - B Set X/Y separate from Z### | ||
| + | If you are cutting all the way through your project board please remember to add a temporary secondary spoil board to prevent cutting into the primary spoil board. | ||
| - | - 1. Insert Shapeoko Dowel Prob tool into the routers bit collet , this will give a more accurate zero location rather than using a true End mill. It will account for non perfectly round fluted bits | + | - 1. Insert |
| - 2. Hit resume in Carbide Motion, machine should auto jog to the bit setter/ | - 2. Hit resume in Carbide Motion, machine should auto jog to the bit setter/ | ||
| - 3. Manually jog machine to middle of the hole in the BitZero tool | - 3. Manually jog machine to middle of the hole in the BitZero tool | ||
| Line 62: | Line 65: | ||
| - 10. When prompted remove the BitZero magnetic ground clip | - 10. When prompted remove the BitZero magnetic ground clip | ||
| - 11. When you click continue the machine should automatically measure the bit. | - 11. When you click continue the machine should automatically measure the bit. | ||
| - | - 12. Now we need to reset “Z” zero | + | - 12. Now we need to reset the “Z” zero position |
| - | - 13. Now you need to insert the actual "End Mill" to be used | + | - 13. Click on the Run tab at the top of Carbide Motion |
| - | - 14. Click on the Run tab at the top of Carbide Motion | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| - | | + | |
| ### Completed Zeroing X Y Z ### | ### Completed Zeroing X Y Z ### | ||
| Line 106: | Line 108: | ||
| - Click the "Save ToolPath" | - Click the "Save ToolPath" | ||
| - Select one the the ToolPaths listed at the far bottom, Click "Save ToolPath(s)" | - Select one the the ToolPaths listed at the far bottom, Click "Save ToolPath(s)" | ||
| + | - Within the " | ||
| + | - Within the "Post Processor" | ||
| + | - If you do not find within the Machine drop down " | ||
| + | - From within " | ||
| + | - Click Apply and Ok to save the selection. | ||
| - Select a place to save the ToolPath G-Code where Carbide Motion can get to it. | - Select a place to save the ToolPath G-Code where Carbide Motion can get to it. | ||
| + | - NOTE: Only a full licensed version of VCarve is able to generate/ | ||
| - Exit VCarve | - Exit VCarve | ||
| #### Carbide Motion - Run Your Job #### | #### Carbide Motion - Run Your Job #### | ||
| - | - Start Carbide Motion | + | - Make sure you have successfully run through [[# |
| - | - Turn on the Shapeoko | + | |
| - | - At the main page run though the " | + | |
| - When Initialization is complete, load your projects G-Code file that was saved from VCarve Pro | - When Initialization is complete, load your projects G-Code file that was saved from VCarve Pro | ||
| - | The following | + | **The following |
| + | - Load your project' | ||
| - Select the Carbide Motion " | - Select the Carbide Motion " | ||
| - Click "Start Job" | - Click "Start Job" | ||
checklist/shapeokoinitnotes.1757889751.txt.gz · Last modified: 2025/09/14 22:42 by 8c244b37-0747-c193-0a4e-0967254778dd
