checklist:cnc_startup [2025/10/12 21:26] 8c244b37-0747-c193-0a4e-0967254778ddchecklist:cnc_startup [2025/11/16 01:48] (current) – minor tweaks 8c244b37-0747-c193-0a4e-0967254778dd
Line 1: Line 1:
-** NOTE THIS PAGE IS UNDER CONSTRUCTION ** \\ \\ +  
-===== ** THIS IS STILL UNDER REVIEW. The following should be generally correct, please run though this with a knowledgeable member when running your first project** ===== +**This detailed guide is subject to change so, for personal and machine safety, please ask an experienced lab member to assist in helping you through your first couple of uses.**
-\\ +
  
 ===== Shapeoko Startup Procedure as of 01/02/2024 ===== ===== Shapeoko Startup Procedure as of 01/02/2024 =====
Line 22: Line 21:
  
 ### General Comments about stepper motors driving the gantry ### General Comments about stepper motors driving the gantry
-''**NOTE:** +**NOTE:** 
-The Shapeoko Pro gantry is powered by NEMA 23 stepper motors. When the power is off, moving the motors by hand will cause them to generate electricity,known as back electromotive force (EMF).''+The Shapeoko Pro gantry is powered by NEMA 23 stepper motors. When the power is off, moving the motors by hand will cause them to generate electricity,known as back electromotive force (EMF).
  
-''WARNING: Avoid it if possible, but if moving the gantry by hand is required, go slowly and in short increments. The power generated by the stepper motors will feel like bumps and could be confused with debris in the rails.''+WARNING: Avoid it if possible, but if moving the gantry by hand is required, go slowly and in short increments. The power generated by the stepper motors will feel like bumps and could be confused with debris in the rails.
  
-''If the lights on the controller are lighting up, it’s very important to stop and slow down, because you are pushing electricity back through the board. Too much back flow __could__ damage the controller.''+If the lights on the controller are lighting up, it’s very important to stop and slow down, because you are pushing electricity back through the board. Too much back flow __could__ damage the controller.
  
  
Line 34: Line 33:
  
 #### Thoroughly clean the machine of dust and debris #### Thoroughly clean the machine of dust and debris
-''It is required that one performs the following cleaning procedures before starting the machine.''+It is required that one performs the following cleaning procedures before starting the machine.
  
 Dust/dirt/saw dust can be a major impediment to successfully carving your project. Debris in the guide rails/belts can prevent the smooth operation of the gantry. Dust/dirt/saw dust can be a major impediment to successfully carving your project. Debris in the guide rails/belts can prevent the smooth operation of the gantry.
Line 42: Line 41:
 ### Cleaning Prior to power on: ### Cleaning Prior to power on:
  
-''- The machine should be thoroughly vacuumed to remove as much saw dust and debris as possible. Any excess dust can get tracked into the bearing which then necessitate a more extensive cleaning and possible dismantling.''+- The machine should be thoroughly vacuumed to remove as much saw dust and debris as possible. Any excess dust can get tracked into the bearing which then necessitate a more extensive cleaning and possible dismantling.''
  
-''- Then one can use compressed air to more thoroughly remove the dust. Be mindful of any moisture that may be expelled from the compressed air. +- Then one can use compressed air to more thoroughly remove the dust. Be mindful of any moisture that may be expelled from the compressed air. 
-NOTE: Try to avoid blowing compressed air toward any of the gantry bearings.''+NOTE: Try to avoid blowing compressed air toward any of the gantry bearings.
  
-''- If needed the rails can be brushed off with the nylon brushes then wiped down with a lint free cloth containing a bit of dust collecting alcohol, trying to remove as much debris from the V rails as reasonably possible.''+- If needed the rails can be brushed off with the nylon brushes then wiped down with a lint free cloth containing a bit of dust collecting alcohol, trying to remove as much debris from the V rails as reasonably possible.
    
-''- Inspect the drive belts, again cleaning off any saw dust/debris. ''+- Inspect the drive belts, again cleaning off any saw dust/debris.
  
-''- Gantry smooth movement will be further tested below once Carbide Motion is started and the machine is powered on. Point 12 in the startup order below.''+- Gantry smooth movement will be further tested below once Carbide Motion is started and the machine is powered on. Point 12 in the startup order below.
  
 #### Example Cleaning Video #### Example Cleaning Video
Line 58: Line 57:
  
 ** Please ignore any portion dealing with lubrication or machine adjustment. ** Please ignore any portion dealing with lubrication or machine adjustment.
- That needs to be left to those most knowledgeable.Please do not dismantle any part of the machine, adjustments are super critical to proper operation.+ That needs to be left to those most knowledgeable. Please do not dismantle any part of the machine, adjustments are super critical to proper operation.
  If you feel maintenance is required please contact an area coordinator and report to the discord channel #cnc.**  If you feel maintenance is required please contact an area coordinator and report to the discord channel #cnc.**
  
 * [[https://youtu.be/wbgpXzvJ-8M?si=IaT4dRUIPFIgAxsO|A general Cleaning overview]] * [[https://youtu.be/wbgpXzvJ-8M?si=IaT4dRUIPFIgAxsO|A general Cleaning overview]]
  
-Continuing with the startup: 
  
-#### Shop Vac +### Getting familiar with the process to initialize The Shapeoko Machine via Carbide Motion
- Empty the connected shop vac of any shavings/dust and ensure the vacuum hose is positioned to allow maximum air movement.+
  
- +The following videos run though the basic procedures to initialize the Shapeoko machine using the machine controlling software, Carbide Motion. Before continuing to operate the actual machine you are strongly encouraged 
-=== Controls under the Shapeoko table === + to familiarize yourself with the initialization process. 
- +Each video provides some details that the others may not.
-{{cnc:vdfcontroller_controls.jpg}} +
- +
-Controls: +
- +
-* 1. Shop Vac control box +
- +
-* 2. VDF Controller Start/Stop button +
- +
-* 3. VDF spindle speed indicator +
- +
-* 4. Obsolete Start/Stop button +
- +
-### Initialize The Shapeoko Machine via Carbide Motion +
- +
-The following videos run though the basic procedures to initialize the Shapeoko machine using the machine controlling software, Carbide Motion. Before continuing please familiarize yourself with the initialization process. +
-Each video provides some details that the other may not.+
  
 This first one is from the Carbide3d learning center. It contains a series of getting started videos. Some do cover some basic machine setup and adjustment checks. Feel free This first one is from the Carbide3d learning center. It contains a series of getting started videos. Some do cover some basic machine setup and adjustment checks. Feel free
Line 113: Line 94:
 Toward the end of the video you will notice the sample job did end up cutting into the spoil board. It's recommended to add a second spoil board on top of the primary if your job will cut entirely though your project piece. Toward the end of the video you will notice the sample job did end up cutting into the spoil board. It's recommended to add a second spoil board on top of the primary if your job will cut entirely though your project piece.
  
-Now that you have reviewed the video, here is a link to a page you can print and take with you as a refresher +==== Continuing with the physical lab machine startup: ====
-[[shapeokoinitnotes|Shapeoko - Carbide Motion Initialization Notes]]+
  
-Continuing with the startup:+#### Shop Vac 
 + Empty the connected shop vac and it's associated cyclone collector of any shavings/dust and ensure the vacuum hose is positioned to allow maximum air movement and free to move unobstructed across the machine bed.
  
-==== Here is a suggested startup order ====+ 
 +=== Controls under the Shapeoko table === 
 + 
 +{{cnc:vdfcontroller_controls.jpg}} 
 + 
 +Controls: 
 + 
 +* 1. Shop Vac control box 
 + 
 +* 2. VFD Controller Start/Stop button 
 + 
 +* 3. VFD spindle speed indicator 
 + 
 +* 4. Obsolete Start/Stop button 
 + 
 +=== Available Shapeoko bit Collets === 
 + 
 +The lab Shapeoko has two different sized collets for different sized bits, a 1/4" and 1/8" collet. They should be kept in the  
 +collet containers seen in the following: 
 + 
 +{{cnc:cnccollets.jpg}} 
 + 
 +==== Here is a suggested physical machine startup order ====
  
 * 1. Turn on computer with pin 2021 * 1. Turn on computer with pin 2021
Line 131: Line 134:
   * There is a small in-line power button on a cord on the left side of the machine that also must be on for the machine to be powered on. This one is "normally" on.   * There is a small in-line power button on a cord on the left side of the machine that also must be on for the machine to be powered on. This one is "normally" on.
  
-* 5. Push the round start button on the lower front of the VDF controller, if the lower light is offpush the button. When the lower light is lite the spindle is ready to power on when your program starts. The top led should flash 0.0.+* 5. Turn on the VFD (Variable Frequency Drive) controller located under the table on the left. If the light around the lower/round start button is not litpress the button. 
 +If after a couple minutes the units top LED's are not flashing "00." make sure the VFD main power switch is turned on, it may be off even if the  
 +start button is lit. It's located right next to/behind where the power cord enters the unit. 
 + 
 +With the led's flashing it is ready power on the spindle when your program is run. The top led should flash 0.0.
  
- *** NOTE: If the round button is lit but you still do not see the LEDs lit, make sure the VDF main power switch is turned on. It's+ ** NOTE: If the round button is lit but you still do not see the LEDs lit, make sure the VFD main power switch is turned on. It's
 located right next to/behind where the power cord enters the unit.** located right next to/behind where the power cord enters the unit.**
  
-* 6. plug in thumb drive containing your project. 
  
-* 7. Start up the carbide motion software on the attached computer.+==== Summary Notes ==== 
 +Now that you have reviewed the videos and gotten familiar with the machine controls, here is a link to a page that details futher the machine initialization process. It's a version you can print and take with you as a refresher 
 +[[shapeokoinitnotes|Shapeoko - Carbide Motion Initialization Notes]] This page also expands on the following 
 +high level details of running your job.
  
-* 8. import your vcarve file into Carbide Motion and generate gcode+==== Overview of executing your project ====  **EDITOR NOTE: NEEDS WORK**
  
-9If needed, jog the cutter out of the way to setup your work.+1plug in thumb drive containing your project.
  
-10Attach your work piece to the spoil board via the hold down of choice.+2Start up the carbide motion software on the attached computer.
  
-** NOTE Please try to avoid cutting into the attached spoil boardDue to the size requirements replacing it is not a fun project. If your project requires cutting all the way through your project piece, place your own, temporary, spoil board under your project piece.** +3Click the "Initialize Machine" button within Motion.
-  * Front edge of the new spoiler boards may not square. +
-  *Don’t use it to square your work piece. +
-  *The spoiler board screw holes are definitely square so use them to align your work piece. +
-  *Using the holes for alignment has proved effective in the past. +
-\\+
  
-11 Initialize the machine per the videos above.+4. Click on the "Connect to Cutter" button. 
 +  The machine will home and test the X,Y,Z limits and motion. It will travel to the home position at the far right corner, 
 +   then move back to the near front so a bit can be installed.
  
-''12 At this point it is advised to run the gantry through the X/Y movements to ensure smooth operationMove the gantry via the Jog panel within Carbide Motion. You can use the Fast speed setting to test the movement, just be sure to avoid crashing the gantry into the X/Y stops.''+4Select the "Jog" tab
  
 +* 5 At this point it is advised to run the gantry through the X/Y movements to ensure smooth operation. Move the gantry via the Jog panel within Carbide Motion.
 + You can use the Fast speed setting to test the movement, just be sure to avoid crashing the gantry into the X/Y stops.
 + When running this test listen for/observe any skipping, stutter or dragging that might indicate there is dirt in the guide rails. If so then a more
 +through cleaning is required.
  
-13When promptedinsert the desired cutter bit. For safety, ensure the machine is powered down before inserting. this requires the use of the precision collets and tighten using two wrenches when the cutter is inserted.+6If neededjog the cutter out of the way to setup your work.
  
-{{cnc:cnccollets.jpg}}+* 7. Attach your work piece to the spoil board via the hold down of choice.
  
-14hit resume to measure bit+** NOTE Please try to avoid cutting into the attached spoil boardDue to the size requirements replacing it is not a fun project. If your project requires cutting all the way through your project piece, place your own, temporary, spoil board under your project piece.** 
 +  * Front edge of the new spoiler boards may not be square, so don’t use them to square your work piece. The spoiler board screws/screw holes are definitely square. They have proved effective for aligning your work piece.
  
-* 15. TBD if more is required... 
  
-This concludes the physical startup and initialization of the machineOne should be able to run your job at this point. Please contact the area coordinator or post a note to discord request help with running the software, especially if this is your first time.+* 8Set the X,Y,Z bit zero positions refer to this document for details: [[shapeokoinitnotes|Shapeoko - Carbide Motion Initialization Notes]]
  
-==== Load G-Code/Execute File ====+==== Load G-Code/Execute Your Project in Carbide Motion ====
  
-16. Load gcode file +9Within the Motion main screen, Select the "Run" tab 
-17Execute job, + 
-  * your program will control the rpms. +* 10. Select "Load new File" button to import your Vcarve saved g-code file into Carbide Motion 
-  * You won't be prompted to turn on the router. If the lower circular light is not on (see step above), the router will not spin and you will crash the bit. (Trust me I know from experience.) + 
-18. When your spindle fires up, the VDF controller will look like the following picture: This job happened to +11Click on the "Start the job" button to begin execution, 
-want 22,000 rpms per the program but showed 22,260 on the VDF.+**NOTE:**  
 +  * your program will control the rpms. You won't be prompted to turn on the router. If the VFD LEDs are not lit, (see step above), the router will not spin and you will crash the bit. (Trust me I know from experience.) 
 +  * Be prepared to hit the stop/pause button if the spindle does note start or the vacuum does not start. 
 + 
 +12. When your spindle fires up, the VFD controller will look like the following picture: This job happened to 
 +want 22,000 rpms per the program but showed 22,260 on the VFD. 
 + 
 +* 13. At this point the vacuum should have automatically started. If not, hit the "Stop/Cancel" button to halt the execution and troubleshoot why the vacuum is not starting.
  
 Controller started Controller started
 {{cnc:vdfstarted.jpg}} {{cnc:vdfstarted.jpg}}
  
-19. The shop vac should start once the spindle reaches a certain speed.+14. The shop vac should start once the spindle reaches a certain speed. 
 + 
 +* 15. When prompted, insert the desired cutter bit. For safety, ensure the spindle is powered down before inserting. this requires the use of the precision collets and tighten using two wrenches when the cutter is inserted. 
 + 
 +* 16. if your project requires bit changes, you will be prompted for a change at the appropriate time. 
 + 
 +* 17. hit "Resume Button" to continue and the machine will run through it process to measure the bit. 
 + 
 +* 18. TBD if more is required... 
 + 
 +This concludes the physical startup and initialization of the machine. One should be able to run your job at this point. Please contact the area coordinator or post a note to discord request help with running the software, especially if this is your first time. 
 + 
 + 
  
  
 ==== Power Down ==== ==== Power Down ====
  
-* 20. When the VDF powers down it takes a minute or two to discharge the capacitor, so it will appear to be on for a bit.+ When the VFD powers down it takes a minute or two to discharge the capacitor and extinguish the LEDs, so it will appear to be on for a bit.
  
  
-The VDF controller should look like the following,+The VFD controller should look like the following,
  
 {{cnc:vdfcontroller.jpg}} {{cnc:vdfcontroller.jpg}}
Line 196: Line 226:
 \\ \\ \\ \\
 Suggestions: Suggestions:
- 
-* We may want to secure the cables and the controller some. I was moving some stuff and got caught up in the new controller wires. 
  
 * We may want to square up the front edge of the new spoiler board. * We may want to square up the front edge of the new spoiler board.